We introduce ourselves as one of the pioneers
of Solid Waste Management Project in India. We
are presently handling 100 TPD Solid Waste Management
Project at Puri (Orissa) and are in advanced negotiations
with Shimla Municipality (Himachal Pradesh) for a
similar project.
The Project involves windrow dumping of the garbage
which is biologically treated with Bacterial powder.This
treated garbage after different levels of screening
is converted into organic manure. The conversion ratio
of garbage to manure is 20%. The key to this Project
for any organisation is to sell the final product
(Organic Manure).
|

|
 |
The Organic Manure due to infusion of Bacteria is
very beneficial for the soil as Bacteria multiplies
very fast in the soil and helps in the breakdown of
plant nutrients like Urea, Phosphate etc into available
forms to the plants. It also enriches physical properties
of the soil i.e water holding capacity, aeration.
Thus it not only helps in increasing the physical
property of the soil as done by other Organic Manure's
but also contributes in breakdown of inorganic fertilizers
which other Organic Manure's cannot do.
|
This process of Solid Waste Management is the most cost effective
method of disposal of Solid Waste for any Municipality. First
of all it reduces the requirement of land as there are no
landfills required. Secondly it reduces the number of work
force engaged in handling garbage. Moreover this method requires
least amount of money and land, compared to other Waste Management
techniques available in our country.
Thus
in the backdrop of the above advantages and pollution
hazardss caused by Solid waste, a proper systemized
management of Solid Waste has become essential.It
also lays down the rules for proper Solid Waste Management
and timely execution of it.
This process is essentially Aerobic Composting of
the garbage. The Solid Waste is dried up naturally
under the sunlight and is decomposed with the help
of bacterial culture powder and water.The process
is the most efficient way of disposing garbage as
it is done within 22 days. This process also is the
most cost efficient as it requires least amount workforce,
capital and labour which is essential for any commercial
enterprise to flourish. |
 |